Notwithstanding federal regulations, the board and the department shall adopt rules under section 1 of this chapter that require the applicant for a vertical expansion of an existing permitted landfill to submit design, engineering, and operational requirements, including the following:
IC 13-19-3-6
Pre-1996 Recodification Citation: 13-1-12-9(d).