Current through P.L. 171-2024
Section 13-18-26-1 - Certificate of completion required(a) Except as provided in subsection (c), a permit required under IC 13-18-16 for the operation of a public water system may not be issued unless the application contains the certification of completion required under section 2 of this chapter.(b) Except as provided in subsection (c), the department may not issue a permit required under environmental management laws for the discharge from a wastewater treatment plant, as defined in IC 13-11-2-258(b), unless the application contains the certification of completion required under section 2 of this chapter.(c) The requirement of a certification of completion under section 2 of this chapter does not apply to the following: (1) A noncommunity public water system that has fewer than fifteen (15) service connections used by year-round residents.(2) A noncommunity public water system that regularly serves fewer than twenty-five (25) year-round residents.(3) A permit for the modification or expansion of a drinking water treatment plant that does not increase system design capacity.(4) A permit for a wastewater treatment plant with an average design flow of not more than one hundred thousand (100,000) gallons per day.(5) A permit for the modification or expansion of a wastewater treatment plant that does not increase average design flow.(6) The renewal of an NPDES permit for the discharge from a wastewater treatment plant that does not include a modification or expansion as described in subdivision (5).Amended by P.L. 15-2019,SEC. 12, eff. 7/1/2019.Added by P.L. 126-2018,SEC. 6, eff. 7/1/2018.