The commissioner may not issue any permit to a solid waste incinerator required by the federal Clean Air Act (42 U.S.C. 7401 et seq.), as amended by the Clean Air Act Amendments of 1990 (P.L. 101-549), if the commissioner is also responsible in whole or in part for the design, construction, or operation of the unit.
IC 13-17-3-13
Pre-1996 Recodification Citation: 13-1-1-4(l).