Current through P.L. 171-2024
Section 13-15-3-5 - Department may issue certain permits only after staff action; local approval(a) Whenever a permit is required by any rule of the board under IC 13-15-1 for the construction, installation, operation, or modification of any facility, equipment, or device, the permit may be issued only after the department staff has:(1) approved the plans and specifications; and(2) determined that the facility, equipment, or device meets the requirement of the rule.(b) Notwithstanding subsection (a) and subject to subsection (c), a person to whom a permit has been issued may not start the construction, installation, operation, or modification of a facility, equipment, or a device until the person has obtained any approval required by any: (3) town; in which the facility, equipment, or device is located.
(c) Subsection (b) applies only to an approval required in an applicable ordinance, rule, or regulation in effect at the time the person submits the permit application to the issuing state agency.Pre-1996 Recodification Citation: 13-7-10-2(d).
Amended by P.L. 133-2012, SEC. 100, eff. 1/1/2013.As added by P.L. 1-1996, SEC.5. Amended by P.L. 78-2009, SEC.12.