selected by the board of public works; and
If the board of public works considers none of the designs, plans, and specifications suitable, the board may not award the premiums. Any premium awarded to the architect who becomes the supervising architect in building the World War memorial shall be considered fully paid by the commission or percentage agreed upon as specified in this chapter.
the board of public works may select the most meritorious of the designs, plans, and specifications and shall notify the successful architect of the selection. The board of public works shall return the rejected designs, plans, and specifications to the respective authors.
IC 10-18-4-7
Pre-2003 Recodification Citation: 10-7-6-6.