620 ILCS 35/15

Current through Public Act 103-1052
Section 620 ILCS 35/15 - Permanent noise monitoring reports

Beginning in 1993 and through 2008, the Division shall, on June 30th and December 31st of each year, prepare a permanent noise monitoring report and make the report available to the public. Beginning in 2009, the airport sponsor shall, on June 30th and December 31st of each year, prepare a permanent noise monitoring report and make the report available to the public. Copies of the report shall be submitted to: the Office of the Governor; the Office of the President of the Senate; the Office of the Senate Minority Leader; the Office of the Speaker of the House; the Office of the House Minority Leader; the United States Environmental Protection Agency, Region V; and the Illinois Environmental Protection Agency. Beginning in 2009, a copy of the report shall also be submitted to the division. The permanent noise monitoring report shall contain all of the following:

(a) Copies of the actual data collected by each permanent noise monitor in the system.
(b) A summary of the data collected by each permanent noise monitor in the system, showing the data organized by:
(1) day of the week;
(2) time of day;
(3) week of the year;
(4) type of aircraft; and
(5) the single highest noise event recorded at each monitor.
(c) Noise contour maps showing the 65 annual CNEL , 70 annual CNEL and 75 annual CNEL zones around the airport.
(d) Noise contour maps showing the 65 decibel (dBA), 70 dBA, and 75 dBA zones around the airport for:
(1) 7:00 a.m. through 6:59 p.m.;
(1.5) 7:00 p.m. through 9:59 p.m.;
(2) 10:00 p.m. through 6:59 a.m.; and
(3) types of aircraft.
(e) The noise contour maps produced under subsections (c) and (d) shall also indicate:
(1) residential areas (single and multi-family);
(2) schools;
(3) hospitals and nursing homes;
(4) recreational areas, including but not limited to parks and forest preserves;
(5) commercial areas;
(6) industrial areas;
(7) the boundary of the airport;
(8) the number of residences (single and multi-family) within each contour;
(9) the number of residents within each contour;
(10) the number of schools within each contour; and
(11) the number of school students within each contour.
(f) Through 2008, a certification by the Division that the system was in proper working order during the period or, if it was not, a specific description of any and all problems with the System during the period.
(g) Beginning in 2009, a certification by the airport sponsor that the system was in proper working order during the period or, if it was not, a specific description of any and all problems with the system during the period.

620 ILCS 35/15

P.A. 87-808.
Amended by P.A. 099-0202,§ 10, eff. 1/1/2016.
Amended by P.A. 096-0037,§ 55-20, eff. 7/13/2009.