Beginning in 1993 and through 2008, the Division shall, on June 30th and December 31st of each year, prepare a permanent noise monitoring report and make the report available to the public. Beginning in 2009, the airport sponsor shall, on June 30th and December 31st of each year, prepare a permanent noise monitoring report and make the report available to the public. Copies of the report shall be submitted to: the Office of the Governor; the Office of the President of the Senate; the Office of the Senate Minority Leader; the Office of the Speaker of the House; the Office of the House Minority Leader; the United States Environmental Protection Agency, Region V; and the Illinois Environmental Protection Agency. Beginning in 2009, a copy of the report shall also be submitted to the division. The permanent noise monitoring report shall contain all of the following:
(a) Copies of the actual data collected by each permanent noise monitor in the system.(b) A summary of the data collected by each permanent noise monitor in the system, showing the data organized by: (4) type of aircraft; and(5) the single highest noise event recorded at each monitor.(c) Noise contour maps showing the 65 annual CNEL , 70 annual CNEL and 75 annual CNEL zones around the airport.(d) Noise contour maps showing the 65 decibel (dBA), 70 dBA, and 75 dBA zones around the airport for:(1) 7:00 a.m. through 6:59 p.m.;(1.5) 7:00 p.m. through 9:59 p.m.;(2) 10:00 p.m. through 6:59 a.m.; and(e) The noise contour maps produced under subsections (c) and (d) shall also indicate: (1) residential areas (single and multi-family);(3) hospitals and nursing homes;(4) recreational areas, including but not limited to parks and forest preserves;(7) the boundary of the airport;(8) the number of residences (single and multi-family) within each contour;(9) the number of residents within each contour;(10) the number of schools within each contour; and(11) the number of school students within each contour.(f) Through 2008, a certification by the Division that the system was in proper working order during the period or, if it was not, a specific description of any and all problems with the System during the period.(g) Beginning in 2009, a certification by the airport sponsor that the system was in proper working order during the period or, if it was not, a specific description of any and all problems with the system during the period.Amended by P.A. 099-0202,§ 10, eff. 1/1/2016.Amended by P.A. 096-0037,§ 55-20, eff. 7/13/2009.