225 ILCS 710/45.05

Current through Public Act 103-1052
Section 225 ILCS 710/45.05 - Loading and unloading cage

At all mines where hoisting is done by cage from 2 or more levels a person shall be employed whose duties shall be to load and unload the cage and to give the signals to the hoisting engineer. The superintendent shall be responsible for the enforcement of this rule.

225 ILCS 710/45.05

P.A. 87-1133.