The Commission may create subcommittees of the Interconnection Working Group to focus on specific issues of importance, as appropriate. The Interconnection Working Group shall report to the Commission on recommended improvements to interconnection rules and tariffs and policies as determined by the Interconnection Working Group at least every 6 months. Such reports shall include consensus recommendations of the Interconnection Working Group and, if applicable, additional recommendations for which consensus was not reached. The Commission shall use the report from the Interconnection Working Group to determine whether processes should be commenced to formally codify or implement the recommendations;
In addition, the nameplate capacity of the eligible renewable electric generating facility that serves the demand of the properties, units, or apartments identified in paragraphs (1) and (2) of this subsection (l) shall not exceed 5,000 kilowatts in nameplate capacity in total. Any eligible renewable electrical generating facility or community renewable generation project that is powered by photovoltaic electric energy and installed after the effective date of this amendatory Act of the 99th General Assembly must be installed by a qualified person in compliance with the requirements of Section 16-128A of the Public Utilities Act and any rules or regulations adopted thereunder.
220 ILCS 5/16-107.5