"Qualifying direct current applicant" means an entity that seeks to provide direct current bulk transmission service for the purpose of transporting electric energy in interstate commerce.
"Qualifying direct current project" means a high voltage direct current electric service line that crosses at least one Illinois border, the Illinois portion of which is physically located within the region of the Midcontinent Independent System Operator, Inc., or its successor organization, and runs through the counties of Pike, Scott, Greene, Macoupin, Montgomery, Christian, Shelby, Cumberland, and Clark, is capable of transmitting electricity at voltages of 345 kilovolts or above, and may also include associated interconnected alternating current interconnection facilities in this State that are part of the proposed project and reasonably necessary to connect the project with other portions of the grid.
Notwithstanding any other provision of this Act, a qualifying direct current applicant that does not own, control, operate, or manage, within this State, any plant, equipment, or property used or to be used for the transmission of electricity at the time of its application or of the Commission's order may file an application on or before December 31, 2023 with the Commission pursuant to this Section or Section 8-406.1 for, and the Commission may grant, a certificate of public convenience and necessity to construct, operate, and maintain a qualifying direct current project. The qualifying direct current applicant may also include in the application requests for authority under Section 8-503. The Commission shall grant the application for a certificate of public convenience and necessity and requests for authority under Section 8-503 if it finds that the qualifying direct current applicant and the proposed qualifying direct current project satisfy the requirements of this subsection and otherwise satisfy the criteria of this Section or Section 8-406.1 and the criteria of Section 8-503, as applicable to the application and to the extent such criteria are not superseded by the provisions of this subsection. The Commission's order on the application for the certificate of public convenience and necessity shall also include the Commission's findings and determinations on the request or requests for authority pursuant to Section 8-503. Prior to filing its application under either this Section or Section 8-406.1, the qualifying direct current applicant shall conduct 3 public meetings in accordance with subsection (h) of this Section. If the qualifying direct current applicant demonstrates in its application that the proposed qualifying direct current project is designed to deliver electricity to a point or points on the electric transmission grid in either or both the PJM Interconnection, LLC or the Midcontinent Independent System Operator, Inc., or their respective successor organizations, the proposed qualifying direct current project shall be deemed to be, and the Commission shall find it to be, for public use. If the qualifying direct current applicant further demonstrates in its application that the proposed transmission project has a capacity of 1,000 megawatts or larger and a voltage level of 345 kilovolts or greater, the proposed transmission project shall be deemed to satisfy, and the Commission shall find that it satisfies, the criteria stated in item (1) of subsection (b) of this Section or in paragraph (1) of subsection (f) of Section 8-406.1, as applicable to the application, without the taking of additional evidence on these criteria. Prior to the transfer of functional control of any transmission assets to a regional transmission organization, a qualifying direct current applicant shall request Commission approval to join a regional transmission organization in an application filed pursuant to this subsection (b-5) or separately pursuant to Section 7-102 of this Act. The Commission may grant permission to a qualifying direct current applicant to join a regional transmission organization if it finds that the membership, and associated transfer of functional control of transmission assets, benefits Illinois customers in light of the attendant costs and is otherwise in the public interest. Nothing in this subsection (b-5) requires a qualifying direct current applicant to join a regional transmission organization. Nothing in this subsection (b-5) requires the owner or operator of a high voltage direct current transmission line that is not a qualifying direct current project to obtain a certificate of public convenience and necessity to the extent it is not otherwise required by this Section 8-406 or any other provision of this Act.
"Decommissioning" has the meaning given to that term in subsection (a) of Section 8-508.1.
"Nuclear power reactor" has the meaning given to that term in Section 8 of the Nuclear Safety Law of 2004.
After the effective date of this amendatory Act of the 103rd General Assembly , no construction shall commence on any new nuclear power reactor with a nameplate capacity of more than 300 megawatts of electricity to be located within this State, and no certificate of public convenience and necessity or other authorization shall be issued therefor by the Commission, until the Illinois Emergency Management Agency and Office of Homeland Security, in consultation with the Illinois Environmental Protection Agency and the Illinois Department of Natural Resources, finds that the United States Government, through its authorized agency, has identified and approved a demonstrable technology or means for the disposal of high level nuclear waste, or until such construction has been specifically approved by a statute enacted by the General Assembly. Beginning January 1, 2026, construction may commence on a new nuclear power reactor with a nameplate capacity of 300 megawatts of electricity or less within this State if the entity constructing the new nuclear power reactor has obtained all permits, licenses, permissions, or approvals governing the construction, operation, and funding of decommissioning of such nuclear power reactors required by:
None of the changes made in this amendatory Act of the 103rd General Assembly are intended to authorize the construction of nuclear power plants powered by nuclear power reactors that are not either:
A public utility shall not be required to obtain but may apply for and obtain a certificate of public convenience and necessity pursuant to this Section with respect to any matter as to which it has received the authorization or order of the Commission under the Electric Supplier Act, and any such authorization or order granted a public utility by the Commission under that Act shall as between public utilities be deemed to be, and shall have except as provided in that Act the same force and effect as, a certificate of public convenience and necessity issued pursuant to this Section.
No electric cooperative shall be made or shall become a party to or shall be entitled to be heard or to otherwise appear or participate in any proceeding initiated under this Section for authorization of power plant construction and as to matters as to which a remedy is available under the Electric Supplier Act.
No certificate of public convenience and necessity shall be construed as granting a monopoly or an exclusive privilege, immunity or franchise.
Notice of the public meeting, including a description of the Project, must be provided in writing to the clerk of each county where the Project is to be located. A representative of the Commission shall be invited to each pre-filing public meeting.
220 ILCS 5/8-406