Current through Public Act 103-1052
Section 415 ILCS 5/57.19 - Costs Incurred after the Issuance of a No Further Remediation LetterThe following shall be considered corrective action activities eligible for payment from the Fund even when an owner or operator conducts these activities after the issuance of a No Further Remediation Letter. Corrective action conducted under this Section and costs incurred under this Section must comply with the requirements of this Title and Board rules adopted under this Title.
(1) Corrective action to achieve residential property remediation objectives if the owner or operator demonstrates that property remediated to industrial/commercial property remediation objectives pursuant to subdivision (c)(3)(A)(ii) of Section 57.7 of this Act is being developed into residential property.(2) Corrective action to address groundwater contamination if the owner or operator demonstrates that action is necessary because a groundwater ordinance used as an institutional control pursuant to subdivision (c)(3)(A)(iii) of Section 57.7 of this Act can no longer be used as an institutional control.(3) Corrective action to address groundwater contamination if the owner or operator demonstrates that action is necessary because an on-site groundwater use restriction used as an institutional control pursuant to subdivision (c)(3)(A)(iv) of Section 57.7 of this Act must be lifted in order to allow the installation of a potable water supply well due to public water supply service no longer being available for reasons other than an act or omission of the owner or operator.(4) The disposal of soil that does not exceed industrial/commercial property remediation objectives, but that does exceed residential property remediation objectives, if industrial/commercial property remediation objectives were used pursuant to subdivision (c)(3)(A)(ii) of Section 57.7 of this Act and the owner or operator demonstrates that (i) the contamination is the result of the release for which the owner or operator is eligible to seek payment from the Fund and (ii) disposal of the soil is necessary as a result of construction activities conducted after the issuance of a No Further Remediation Letter on the site where the release occurred, including, but not limited to, the following: tank, line, or canopy repair, replacement, or removal; building upgrades; sign installation; and water or sewer line replacement.(5) The disposal of water exceeding groundwater remediation objectives that is removed from an excavation on the site where the release occurred if a groundwater ordinance is used as an institutional control pursuant to subdivision (c)(3)(A)(iii) of Section 57.7 of this Act, or if an on-site groundwater use restriction is used as an institutional control pursuant to subdivision (c)(3)(A)(iv) of Section 57.7, and the owner or operator demonstrates that (i) the excavation is located within the measured or modeled extent of groundwater contamination resulting from the release for which the owner or operator is eligible to seek payment from the Fund and (ii) disposal of the groundwater is necessary as a result of construction activities conducted after the issuance of a No Further Remediation Letter on the site where the release occurred, including, but not limited to, the following: tank, line, or canopy repair, replacement, or removal; building upgrades; sign installation; and water or sewer line replacement. Added by P.A. 096-0908,§ 5, eff. 6/8/2010.