Current through the 2024 Regular Session
Section 62-1104 - INTERSTATE NATURAL GAS TRANSMISSION PIPELINE - INTERSTATE PETROLEUM PRODUCTS PIPELINE - DUTY TO FILE(1) By July 1, 2023, and by January 1 annually thereafter, in counties where a pipeline company operates an interstate natural gas transmission pipeline or interstate petroleum products pipeline, as recognized by the pipeline and hazardous materials safety administration, the company must file with the county the following:(a) Interstate natural gas transmission pipeline or interstate petroleum products pipeline location information, including but not limited to the easement or other documents reflecting the actual location of the interstate natural gas transmission pipeline or interstate petroleum products pipeline, marking facilities on design drawings, and maps; and(b) Current information for three (3) natural people designated as agents authorized to act on the pipeline company's behalf. Information for each person must include:(2) If a pipeline company fails to comply with the requirements of this section: (a) The requirement to include the pipeline company's interstate natural gas transmission pipeline or interstate petroleum products pipeline information on a plat as required by section 50-1304, Idaho Code, is void; and(b) Notice to the pipeline company, as required by sections 67-6511 and 67-6519, Idaho Code, is void.Added by 2023 Session Laws, ch. 140,sec. 2, eff. 7/1/2023.