Idaho Code § 54-1904C

Current through the 2024 Regular Session
Section 54-1904C - GROUNDS FOR RELIEF

The bidder shall establish to the satisfaction of the public entity that:

(a) A clerical or mathematical mistake was made;
(b) The bidder gave the public entity written notice within five (5) calendar days after the opening of the bids of the mistake, specifying in the notice in detail how the mistake occurred; and
(c) The mistake was material.

Idaho Code § 54-1904C

[54-1904C, added 1991, ch. 282, sec. 2, p. 729.]