When the director determines that a structure is a probable hazard within the meaning of this chapter, he shall notify the owner of the land, or operator or owner of the structure who shall have twenty (20) days after the receipt of such notice to show cause why such structure should not be determined to be a hazard.
Idaho Code § 21-517