Section 113A-57 - Mandatory standards for land-disturbing activityNo land-disturbing activity subject to this Article shall be undertaken except in accordance with the following mandatory requirements:
(1) No land-disturbing activity during periods of construction or improvement to land shall be permitted in proximity to a lake or natural watercourse unless a buffer zone is provided along the margin of the watercourse of sufficient width to confine visible siltation within the twenty-five percent (25%) of the buffer zone nearest the land-disturbing activity. Waters that have been classified as trout waters by the Environmental Management Commission shall have an undisturbed buffer zone 25 feet wide or of sufficient width to confine visible siltation within the twenty-five percent (25%) of the buffer zone nearest the land-disturbing activity, whichever is greater. Provided, however, that the Sedimentation Control Commission may approve plans which include land-disturbing activity along trout waters when the duration of said disturbance would be temporary and the extent of said disturbance would be minimal. This subdivision shall not apply to a land-disturbing activity in connection with the construction of facilities to be located on, over, or under a lake or natural watercourse.(2) The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion-control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion.(3) Whenever land-disturbing activity that will disturb more than one acre is undertaken on a tract, the person conducting the land-disturbing activity shall install erosion and sedimentation control devices and practices that are sufficient to retain the sediment generated by the land-disturbing activity within the boundaries of the tract during construction upon and development of the tract, and shall plant or otherwise provide a permanent ground cover sufficient to restrain erosion after completion of construction or development within a time period to be specified by rule of the Commission.(4) No person shall initiate any land-disturbing activity that will disturb more than one acre on a tract unless, 30 or more days prior to initiating the activity, an erosion and sedimentation control plan for the activity is filed with the agency having jurisdiction and approved by the agency. An erosion and sedimentation control plan may be filed less than 30 days prior to initiation of a land-disturbing activity if the plan is submitted under an approved express permit program, and the land-disturbing activity may be initiated and conducted in accordance with the plan once the plan has been approved. The agency having jurisdiction shall forward to the Director of the Division of Water Resources a copy of each erosion and sedimentation control plan for a land-disturbing activity that involves the utilization of ditches for the purpose of de-watering or lowering the water table of the tract.(5) The land-disturbing activity shall be conducted in accordance with the approved erosion and sedimentation control plan.N.C. Gen. Stat. § 113A-57
Amended by 2013 N.C. Sess. Laws 413,s. 57-f, eff. 8/23/2013.Amended by 2006 N.C. Sess. Laws 264,ss. 53.(b), 53.(a), eff. 8/27/2006.Amended by 2006 N.C. Sess. Laws 255,s. 2, eff. 8/23/2006.Amended by 2005 N.C. Sess. Laws 443, s. 2, eff. 10/1/2005.Amended by 2005 N.C. Sess. Laws 386, s. 7.2, eff. 1/1/2006.Amended by 2002-165, s. 2.6, eff. 10/23/2002. 1973, c. 392, s. 8; c. 1417, s. 5; 1975, c. 647, s. 2; 1979, c. 564; 1983 Reg. Sess., 1984 , c. 1014, s. 3; 1987, c. 827, s. 131; 1989, c. 676, s. 3; 1991, c. 275, s. 2; 1998-99, s. 1; 1999-379, s. 2.