Current with legislation from the 2024 Regular and Special Sessions.
Section 4b-77 - Electric vehicle charging stations required for new construction(a) As used in this section, (1) "electric vehicle charging station" has the same meaning as provided in section 16-19f of the general statutes, (2) "level two electric vehicle charging station" means an electric vehicle charging station that supplies two hundred eight to two hundred forty volt alternating current, and (3) "direct current fast charging station" means an electric vehicle charging station that utilizes direct current electricity providing forty kilowatts or greater.(b) On and after January 1, 2023, the Commissioner of Administrative Services shall require each new construction of a state facility, the total project costs of which exceed one hundred thousand dollars, to be installed with level two electric vehicle charging stations in at least twenty per cent of the designated parking spaces for cars or light duty trucks at such facility.(c) On and after January 1, 2023, a municipality shall require each new construction of a commercial building or multiunit residential building with thirty or more designated parking spaces for cars or light duty trucks to include electric vehicle charging infrastructure that is capable of supporting level two electric vehicle charging stations or direct current fast charging stations in at least ten per cent of such parking spaces. A municipality may, through its legislative body, require any such commercial building or multiunit residential building to include such electric vehicle charging infrastructure in more than ten per cent of such parking spaces.Added by P.A. 22-0025,S. 5 of the Connecticut Acts of the 2022 Regular Session, eff. 10/1/2022.