Mass. Gen. Laws ch. 91 § 54

Current through Chapters 1 to 249 and Chapters 253 to 255 of the 2024 Legislative Session
Section 91:54 - Dumping; notice; inspector; cost of supervision

Every contractor or other person shall, at least three days before commencing any piece of dredging in tide water, give written notice to the department of the location and amount of the proposed work, and the time at which it is expected work will begin and, except with the written assent of the department, no dredge or other material which it is proposed to dump in tide water, shall be transported or dumped within the tide waters of the commonwealth, unless there is present on board the scows containing the material, or on the boat towing the same, an inspector employed for that purpose by the department; and no such material shall, in any event, be dumped within the limits of any channel which has been deepened by dredging, nor in any other part of the tide waters of the commonwealth, unless the same is duly authorized. The state treasurer may recover in contract from such contractor or person the cost of supervision determined as provided in the two preceding sections.

Mass. Gen. Laws ch. 91, § 54