In ordering the construction of sidewalks, water mains, or sewers, the procedure shall be as required in section 31-25-503 (2), (3), (4), (5), (6), and (8) but shall not be subject to section 31-25-503 (1)(a) to (1)(c) and (7).
C.R.S. § 31-25-517
(1) This section is similar to former § 31-25-524 as it existed prior to 1975.
(2) This section was originally numbered as § 31-25-516 in House Bill 75-1089 but was renumbered on revision in 1977 for ease of location.