The Board shall not reduce allocations based solely on voluntary improvements in nutrient removal technology.
PROJECT NAME | DESCRIPTION (COMPLIANCE SCHEDULE) |
HRSD-Chesapeake/Elizabeth STP | Consolidate into regional system and close treatment facility (1/1/2023) |
HRSD-Boat Harbor WWTP | Convey by subaqueous crossing to Nansemond River WWTP for nutrient removal (1/1/2026) |
HRSD-Nansemond River WWTP | Upgrade and expand with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) |
HRSD-Nassawadox WWTP | Convey to regional system for nutrient removal (1/1/2026) |
Fredericksburg WWTF | Expand with nutrient removal technology of 3.0 mg/L total nitrogen and 0.22 mg/L total phosphorus (1/1/2026) |
Spotsylvania Co.-FMC WWTF | Convey to Massaponax WWTF and close treatment facility (1/1/2026) |
Spotsylvania Co.-Massaponax WWTF | Expand with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus to consolidate and close FMC WWTF (1/1/2026) |
Spotsylvania Co.-Thornburg STP | Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) |
HRRSA-North River WWTP | Phosphorus removal tertiary filtration upgrade (1/1/2026) |
South Central Wastewater Authority WWTF | Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) |
HRSD-Williamsburg WWTP | Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) |
HRSD-VIP WWTP | Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) |
HRSD-James River WWTP | Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2028) |
HRSD-Army Base WWTP | Convey to VIP WWTP for nutrient removal (1/1/2032) or upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) |
Each priority project and the associated schedule of compliance shall be incorporated into the applicable Virginia Pollutant Discharge Elimination System permit or registration list. Each priority project facility shall be in compliance (i) by complying with applicable annual average total nitrogen and total phosphorus concentrations for compliance years 2026, 2028, and 2032; (ii) for the South Central Wastewater Authority WWTF, by implementing a phased construction program approved by the Department, and acquiring sufficient point source credits until its phased construction is completed as provided in this subsection; or (iii) only for a facility subject to an aggregated waste load allocation, by exercising the option of achieving an equivalent discharged load by the date set out in the schedule of compliance based on the applicable total nitrogen and total phosphorus annual average concentrations and actual annual flow treated without the acquisition and use of point source credits generated by permitted facilities not under common ownership. Noncompliance shall be enforceable in the same manner as any other condition of a Virginia Pollutant Discharge Elimination System permit.
The following requirements shall apply to the phased construction program to upgrade the South Central Wastewater Authority WWTF:
Reduce the total nitrogen waste load allocation for the HRSD-York River WWTP to 228,444 lbs/year effective January 1, 2026.
Reduce total nitrogen waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:
FACILITY NAME | TOTAL NITROGEN WASTELOAD ALLOCATION (lbs/year) |
HRSD-Army Base WWTP | 219,307 |
HRSD-Boat Harbor STP | 304,593 |
HRSD-James River STP | 243,674 |
HRSD-VIP WWTP | 487,348 |
HRSD-Nansemond STP | 365,511 |
HRSD-Williamsburg STP | 274,133 |
Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:
FACILITY NAME | TOTAL PHOSPHORUS WASTELOAD ALLOCATION (lbs/year) |
HRSD-Army Base WWTP | 27,413 |
HRSD-Boat Harbor STP | 38,074 |
HRSD-James River STP | 30,459 |
HRSD-VIP WWTP | 60,919 |
HRSD-Nansemond STP | 45,689 |
HRSD-Williamsburg STP | 34,267 |
Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2030:
FACILITY NAME | TOTAL PHOSPHORUS WASTELOAD ALLOCATION (lbs/year) |
HRSD-Army Base WWTP | 21,931 |
HRSD-Boat Harbor STP | 30,459 |
HRSD-James River STP | 24,367 |
HRSD-VIP WWTP | 48,735 |
HRSD-Nansemond STP | 36,551 |
HRSD-Williamsburg STP | 27,413 |
Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2032:
FACILITY NAME | TOTAL PHOSPHORUS WASTELOAD ALLOCATION (lbs/year) |
HRSD-Army Base WWTP | 16,448 |
HRSD-Boat Harbor STP | 22,844 |
HRSD-James River STP | 18,276 |
HRSD-VIP WWTP | 36,551 |
HRSD-Nansemond STP | 27,413 |
HRSD-Williamsburg STP | 20,560 |
Transfer the total nitrogen (454,596 lbs/year) and total phosphorus (41,450 lbs/year) waste load allocations for the HRSD-Chesapeake/Elizabeth STP to the Nutrient Offset Fund effective January 1, 2026.
Transfer the total nitrogen (153,500 lbs/yr) and total phosphorous (17,437 lbs/yr) waste load allocations for the HRSD-J.H. Miles Facility consolidation to HRSD in accordance with the approved registration list December 21, 2015, transfer.
Va. Code § 62.1-44.19:14