Current with changes from the 2024 legislative session through ch. 845
Section 62.1-44.15:33 - Authorization for more stringent ordinancesA. Localities that are serving as VESMP authorities are authorized to adopt more stringent soil erosion control or stormwater management ordinances than those necessary to ensure compliance with the Board's minimum regulations, provided that the more stringent ordinances are based upon factual findings of local or regional comprehensive watershed management studies or findings developed through the implementation of an MS4 permit or a locally adopted watershed management study and are determined by the locality to be necessary to prevent any further degradation to water resources, to address total maximum daily load requirements, to protect exceptional state waters, or to address specific existing water pollution including nutrient and sediment loadings, stream channel erosion, depleted groundwater resources, or excessive localized flooding within the watershed and that prior to adopting more stringent ordinances a public hearing is held. Notice of such hearing shall be given by publication twice in a newspaper of general circulation in the locality seeking to adopt the ordinance, with the first publication appearing no more than 28 days before and the second publication appearing no less than seven days before the hearing. This process shall not be required when a VESMP authority chooses to reduce the threshold for regulating land-disturbing activities to a smaller area of disturbed land pursuant to § 62.1-44.15:34. However, this section shall not be construed to authorize a VESMP authority to impose a more stringent timeframe for land-disturbance review and approval than those provided in this article.B. Localities that are serving as VESMP authorities shall submit a letter report to the Department when more stringent stormwater management ordinances or more stringent requirements authorized by such stormwater management ordinances, such as may be set forth in design manuals, policies, or guidance documents developed by the localities, are determined to be necessary pursuant to this section within 30 days after adoption thereof. Any such letter report shall include a summary explanation as to why the more stringent ordinance or requirement has been determined to be necessary pursuant to this section. Upon the request of an affected landowner or his agent submitted to the Department with a copy to be sent to the locality, within 90 days after adoption of any such ordinance or derivative requirement, localities shall submit the ordinance or requirement and all other supporting materials to the Department for a determination of whether the requirements of this section have been met and whether any determination made by the locality pursuant to this section is supported by the evidence. The Department shall issue a written determination setting forth its rationale within 90 days of submission. Such a determination, or a failure by the Department to make such a determination within the 90-day period, may be appealed to the Board.C. Localities shall not prohibit or otherwise limit the use of any best management practice (BMP) approved for use by the Director or the Board except as follows: 1. When the Director or the Board approves the use of any BMP in accordance with its stated conditions, the locality serving as a VESMP authority shall have authority to preclude the onsite use of the approved BMP, or to require more stringent conditions upon its use, for a specific land-disturbing project based on a review of the stormwater management plan and project site conditions. Such limitations shall be based on site-specific concerns. Any project or site-specific determination purportedly authorized pursuant to this subsection may be appealed to the Department and the Department shall issue a written determination regarding compliance with this section to the requesting party within 90 days of submission. Any such determination, or a failure by the Department to make any such determination within the 90-day period, may be appealed to the Board.2. When a locality is seeking to uniformly preclude jurisdiction-wide or otherwise limit geographically the use of a BMP approved by the Director or Board, or to apply more stringent conditions to the use of a BMP approved by the Director or Board, upon the request of an affected landowner or his agent submitted to the Department, with a copy submitted to the locality, within 90 days after adoption, such authorizing ordinances, design manuals, policies, or guidance documents developed by the locality that set forth the BMP use policy shall be provided to the Department in such manner as may be prescribed by the Department that includes a written justification and explanation as to why such more stringent limitation or conditions are determined to be necessary. The Department shall review all supporting materials provided by the locality to determine whether the requirements of this section have been met and that any determination made by the locality pursuant to this section is reasonable under the circumstances. The Department shall issue its determination to the locality in writing within 90 days of submission. Such a determination, or a failure by the Department to make such a determination within the 90-day period, may be appealed to the Board.D. Based on a determination made in accordance with subsection B or C, any ordinance or other requirement enacted or established by a locality that is found to not comply with this section shall be null and void, replaced with state minimum standards, and remanded to the locality for revision to ensure compliance with this section. Any such ordinance or other requirement that has been proposed but neither enacted nor established shall be remanded to the locality for revision to ensure compliance with this section.E. Any provisions of a local erosion and sediment control or stormwater management program in existence before January 1, 2016, that contains more stringent provisions than this article shall be exempt from the requirements of this section if the locality chooses to retain such provisions when it becomes a VESMP authority. However, such provisions shall be reported to the Board at the time of submission of the locality's VESMP approval package.1989, cc. 467, 499, § 10.1-603.7; 1991, c. 84; 2004, c. 372; 2011, cc. 341, 353; 2012, cc. 785, 819; 2013, cc. 591, 756, 793; 2014, cc. 303, 598; 2023, cc. 506, 507.Amended by Acts 2024 c. 242,§ 1, eff. 7/1/2024.Amended by Acts 2024 c. 225,§ 1, eff. 7/1/2024.Amended by Acts 2023 c. 507,§ 1, eff. 7/1/2023.Amended by Acts 2023 c. 506,§ 1, eff. 7/1/2023.Amended by Acts 2016 c. 758, § 1, eff. 7/1/2021.Amended by Acts 2016 c. 68, § 1, eff. 7/1/2017 , or 30 days after the adoption by the State Water Control Board of the regulations required by the ninth enactment of this act, whichever occurs later..Amended by Acts 2014 c. 598, § 1, eff. 4/4/2014.Amended by Acts 2014 c. 303, § 1, eff. 3/24/2014.Added by Acts 2013 c. 793, § 1, eff. 7/1/2013.Added by Acts 2013 c. 756, § 1, eff. 7/1/2013.