Current with changes from the 2024 legislative session through ch. 845
Section 62.1-44.15:31 - [For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345] Annual standards and specifications for state agencies, federal entities, and other specified entitiesA. State entities, including the Department of Transportation, and for linear projects set out in subsection B, electric, natural gas, and telephone utility companies, interstate and intrastate natural gas pipeline companies, and railroad companies shall, and federal entities and authorities created pursuant to § 15.2-5102 may, annually submit a single set of standards and specifications for Department approval that describes how land-disturbing activities shall be conducted. Such standards and specifications shall be consistent with the requirements of this article and associated regulations, including the regulations governing the General Virginia Stormwater Management Program (VSMP) Permit for Discharges of Stormwater from Construction Activities and the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.) and associated regulations. Each project constructed in accordance with the requirements of this article, its attendant regulations, and where required standards and specifications shall obtain coverage issued under the state general permit prior to land disturbance. The standards and specifications shall include:1. Technical criteria to meet the requirements of this article and regulations developed under this article;2. Provisions for the long-term responsibility and maintenance of stormwater management control devices and other techniques specified to manage the quantity and quality of runoff;3. Provisions for erosion and sediment control and stormwater management program administration, plan design, review and approval, and construction inspection and enforcement;4. Provisions for ensuring that responsible personnel and contractors obtain certifications or qualifications for erosion and sediment control and stormwater management comparable to those required for local government;5. Implementation of a project tracking and notification system to the Department of all land-disturbing activities covered under this article; and6. Requirements for documenting onsite changes as they occur to ensure compliance with the requirements of the article.B. Linear projects subject to annual standards and specifications include:1. Construction, installation, or maintenance of electric transmission, natural gas, and telephone utility lines and pipelines, and water and sewer lines; and2. Construction of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company. Linear projects not included in subdivisions 1 and 2 shall comply with the requirements of the local or state VSMP in the locality within which the project is located.
C. The Department shall perform random site inspections or inspections in response to a complaint to assure compliance with this article, the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.), and regulations adopted thereunder. The Department may take enforcement actions in accordance with this article and related regulations.D. The Department shall assess an administrative charge to cover the costs of services rendered associated with its responsibilities pursuant to this section.1989, cc. 467, 499, § 10.1-603.5; 2004, c. 372; 2012, cc. 785, 819; 2013, cc. 756, 793.Amended by Acts 2018 c. 627, § 1, eff. 7/1/2018.Amended by Acts 2016 c. 68, § 1, eff. 7/1/2017 , or 30 days after the adoption by the State Water Control Board of the regulations required by the ninth enactment of this act, whichever occurs later..Added by Acts 2013 c. 793, § 1, eff. 7/1/2013.Added by Acts 2013 c. 756, § 1, eff. 7/1/2013.