Current with changes from the 2024 legislative session through ch. 845
Section 45.2-1209 - Review of operations plan and reclamation provision by Director; issuance of permitA. Upon receipt of an operations plan acceptable to the Director and bond as required by this article, the Director shall review the plan. If the Director approves the plan, he shall issue a permit. If the Director disapproves the plan, he shall furnish the applicant with his written objections thereto and his required amendments. Until the applicant amends his operations plan to meet the Director's reasonable objections and files a satisfactory amended plan with the Director, no permit shall be issued.B. In reviewing the operations plan, if the Director finds that the operation will constitute a hazard to the public safety or welfare, or that a reasonable degree of reclamation or proper drainage control is not feasible, he may disapprove the permit application. However, the Director may approve the permit after deleting the areas from the permit application that he holds in his findings to be objectionable.C. The Director shall issue the permit unless he finds that the applicant has had control or has had common control with a person, partnership, association, trust, or corporation that has had a mining permit revoked or bond or other security forfeited for failure to reclaim lands as required by law, in which event no permit shall be issued. However, if an operator who forfeited a bond pays, within 30 days of notice and demand by the Director, the cost of reclamation in excess of the amount of the forfeited bond, or if any bond is forfeited and the amount forfeited is equal to or greater than the cost of reclamation, such operator shall then become eligible for another permit.1968, c. 734, § 45.1-184; 1974, c. 312; 1977, c. 312; 2021, Sp. Sess. I, c. 387.