Current with changes from the 2024 legislative session through ch. 845
Section 10.1-1435 - Certification of site approval required; "construction" defined; remediesA. No person shall construct or commence construction of a hazardous waste facility without first obtaining a certification of site approval by the Board in the manner prescribed herein. For the purpose of this section, "construct" and "construction" mean (i) with respect to new facilities, the significant alteration of a site to install permanent equipment or structures or the installation of permanent equipment or structures; (ii) with respect to existing facilities, the alteration or expansion of existing structures or facilities to initially accommodate hazardous waste, any expansion of more than fifty percent of the area or capacity of an existing hazardous waste facility, or any change in design or process of a hazardous waste facility that will, in the opinion of the Board, result in a substantially different type of facility. Construction does not include preliminary engineering or site surveys, environmental studies, site acquisition, acquisition of an option to purchase or activities normally incident thereto.B. Upon receiving a written request from the owner or operator of the facility, the Board may allow, without going through the procedures of this article, any changes in the facilities which are designed to:1. Prevent a threat to human health or the environment because of an emergency situation;2. Comply with federal or state laws and regulations; or3. Demonstrably result in safer or environmentally more acceptable processes.C. Any person violating this section may be enjoined by the circuit court of the jurisdiction wherein the facility is located or the proposed facility is to be located. Such an action may be instituted by the Board, the Attorney General, or the political subdivision in which the violation occurs. In any such action, it shall not be necessary for the plaintiff to plead or prove irreparable harm or lack of an adequate remedy at law. No person shall be required to post any injunction bond or other security under this section. No action may be brought under this section after a certification of site approval has been issued by the Board, notwithstanding the pendency of any appeals or other challenges to the Board's action. In any action under this section, the court may award reasonable costs of litigation, including attorney and expert witness fees, to any party if the party substantially prevails on the merits of the case and if in the determination of the court the party against whom the costs are awarded has acted unreasonably.1986, c. 492, § 10-291; 1988, c. 891.Amended by Acts 1988, c. 891.Amended by Acts 1986, c. 492, § 10-291.