Nothing in Sections 42-1-400 to 42-1-450 shall be construed as preventing a workman from recovering compensation under this title from a subcontractor instead of from the principal contractor but he shall not collect from both.
S.C. Code § 42-1-450
Nothing in Sections 42-1-400 to 42-1-450 shall be construed as preventing a workman from recovering compensation under this title from a subcontractor instead of from the principal contractor but he shall not collect from both.
S.C. Code § 42-1-450