S.C. Code § 4-25-250

Current through 2024 Act No. 225.
Section 4-25-250 - Electricity shall not be furnished to building constructed without permit or to saw service

It shall be unlawful for any electric utility company or electric cooperative to make a new connection of electrical energy to a new building or facility requiring a permit under this article unless such permit was acquired for the construction of the building or facility or to a saw service. Any company or cooperative making such a connection shall report to the county assessor on or before the tenth of each month the location of each such connection, together with such other information as the assessor may direct.

S.C. Code § 4-25-250

1965 (54) 45; 1962 Code Section 14-400.624:1.