Current through bills signed by governor as of 5/17/2024
Said petition shall state:
1. The name of the individual, firm, corporation, company, or association asking for said permit.2. The applicant's principal office and place of business.3. A legal description of the route of said proposed line or lines, together with a map thereof.4. A general description of the public or private highways, grounds and waters, streams and private lands of any kind along, over or across which said proposed line or lines will pass.5. The specifications of material and manner of construction.6. The maximum and normal operating pressure under which it is proposed to transport any solid, liquid, or gaseous substance, except water.7. If permission is sought to construct, maintain and operate facilities for the underground storage of gas said petition shall include the following information in addition to that stated above: a. A description of the public or private highways, grounds and waters, streams and private lands of any kind under which such storage is proposed, together with a map thereof.b. Maps showing the location of proposed machinery, appliances, fixtures, wells and stations necessary for the construction, maintenance and operation of such gas underground storage facilities.8. The possible use of alternative routes.9. The relationship of the proposed project to the present and future land use and zoning ordinances.10. The inconvenience or undue injury which may result to property owners as a result of the proposed project.11. By affidavit, that informational meetings were held in each county which the proposed project will affect and the time and place of each meeting.C31, §8338-d4; C35, §8338-f19; C39, §8338.27; C46, 50, 54, 58, 62, 66, 71, 73, 75, §490.6; C77, 79, 81, §479.6Referred to in §479.5, 479.23