Any applicant or supplier of water may, for cause stated, be required by the board to furnish a complete report of the condition and operation of the water supply, plant, works or system owned, operated or controlled by the said applicant. This report shall be made by a duly licensed professional engineer, the cost and expenses of which shall be paid by the applicant.
Ala. Code § 22-23-46 (1975)