Cal. Wat. Code § 12928.1

Current through the 2023 Legislative Session.
Section 12928.1 - Priority

The department shall give priority to projects of agencies located in overdrafted groundwater basins and those projects of critical need, to projects whose feasibility studies show the greatest economic justification and the greatest engineering and hydrogeologic feasibility as determined by the department, and to projects located in areas which have existing water management programs.

Ca. Water Code § 12928.1

Added by Stats. 1985, Ch. 1034, Sec. 1.