If a district desires to extend the time or times of maturity of any or all of its bonds or warrants payable at stated times or to reduce the rate of interest thereon or to effect any combination of these, it may either:
Ca. Water Code § 24760
If a district desires to extend the time or times of maturity of any or all of its bonds or warrants payable at stated times or to reduce the rate of interest thereon or to effect any combination of these, it may either:
Ca. Water Code § 24760