Cal. Pub. Util. Code § 2842.2

Current through the 2023 Legislative Session.
Section 2842.2 - Long-term planning and reliability assessment for upgrades

The commission shall ensure that an electrical corporation utilizes long-term planning and a reliability assessment for upgrades to its transmission and distribution systems and that any upgrades are not inconsistent with promoting combined heat and power systems that are cost effective, technologically feasible, and environmentally beneficial, particularly as those combined heat and power systems reduce emissions of greenhouse gases.

Ca. Pub. Util. Code § 2842.2

Added by Stats 2007 ch 713 (AB 1613),s 1, eff. 1/1/2008.