Cal. Pub. Util. Code § 345

Current through the 2024 Legislative Session.
Section 345 - [Effective 1/1/2025] Duty to ensure efficient use and reliable operation of transmission grid
(a) The Independent System Operator shall ensure the efficient use and reliable operation of the transmission grid consistent with the achievement of planning and operating reserve criteria that are no less stringent than those established by the Western Electricity Coordinating Council and the North American Electric Reliability Council.
(b) In furtherance of subdivision (a), the Independent System Operator may amend its tariff, as deemed necessary and subject to approval by the Federal Energy Regulatory Commission through its rulemaking process, to be consistent with subdivision (a).

Ca. Pub. Util. Code § 345

Amended by Stats 2024 ch 713 (AB 2368),s 2, eff. 1/1/2025.
Amended by Stats 2003 ch 62 (SB 600), s 257, eff. 1/1/2004.
This section is set out more than once due to postponed, multiple, or conflicting amendments.