Any extension of time for manufacturers to comply with Section 42310, beyond that which is granted pursuant to Section 42310.1 for the rigid plastic packaging containers described in that section, shall only be enacted by a statute passed by a two-thirds vote of both houses of the Legislature.
Ca. Pub. Res. Code § 42345