Browse as ListSearch Within- Section 25500 - Exclusive power to certify sites and facilities; certification in lieu of permit or similar required document; certification required
- Section 25500.1 - Amendment to proposed solar thermal powerplant certificate to convert facility from solar thermal technology to photovoltaic technology
- Section 25500.5 - Certification of sufficient sites and facilities
- Section 25501 - Inapplicability of chapter
- Section 25501.7 - Notice to waive exclusion of site and facility from provisions of chapter
- Section 25502 - Notice of intention to file application for certification
- Section 25502.3 - Waiver of exclusion by filing notice of intention to file application for certification
- Section 25503 - Alternative sites and facilities included in notice
- Section 25504 - Statement in notice describing location of proposed sites
- Section 25504.5 - Site will accommodate maximum electric generating capacity in excess of capacity being proposed
- Section 25505 - Publication of summary of notice; copy transmitted to Public Utilities Commission
- Section 25506 - Comments and recommendations by local, regional, state and federal agencies
- Section 25506.5 - Comments and recommendations by Public Utilities Commission
- Section 25507 - Copy of notice transmitted to California coastal Commission; copy transmitted to San Francisco Bay Conservation and Development Commission
- Section 25508 - Cooperation and advice rendered in studying applications
- Section 25509 - Public informational presentations after notice filed
- Section 25509.5 - Nonadjudicatory hearings after conclusion of presentations
- Section 25510 - Summary and hearing order after conclusion of hearings
- Section 25511 - Information required in determining appropriateness of sites and facilities
- Section 25512 - Summary and hearing order requirements
- Section 25512.5 - Distribution of copy of summary and hearing order
- Section 25513 - Commencement of adjudicatory hearings
- Section 25513.3 - Investigator or advocate in adjudicative proceedings serving as supervisor or presiding officer or assisting presiding officer
- Section 25514 - Final report after conclusion of hearings
- Section 25514.3 - Modifications, conditions or criteria specified for sites and facilities requiring certificate of public convenience and necessity
- Section 25514.5 - Considering acceptability of site proposed to accommodate additional power-generating capacity
- Section 25515 - Hearings on final report
- Section 25516 - Findings approving notice
- Section 25516.1 - Site and related facility found acceptable located in coastal zone, Suisun Marsh or jurisdiction of San Francisco Bay Conservation and Development Commission
- Section 25516.5 - Findings on notice proposing expanded ultimate electric generating capacity for site
- Section 25516.6 - Time for issuing written decision on notice; determination on completeness of notice
- Section 25517 - Certification required to commence construction; restoration of onsite improvements if certification denied
- Section 25518 - Certificate required for issuance of certificate of public convenience and necessity
- Section 25518.5 - Concurrent initiation of application for certificate of public convenience and necessity
- Section 25519 - [Effective Until 1/1/2025] Application for certification of site and facility
- Section 25519 - [Effective 1/1/2025] Application for certification of site and facility
- Section 25519.5 - Site or facilities to be located near military installation, within special use airspace or beneath low-level flight path
- Section 25520 - Information required in application
- Section 25520.5 - Reviewing application for additional facility at potential multiple-facility site
- Section 25521 - Commencement of public hearings on application
- Section 25522 - Time for issuance of written decision on application; determination as to completeness of application
- Section 25523 - Written decision after public hearing
- Section 25523.5 - [Repealed]
- Section 25524 - Additional fees used to contract with third party to assist commission
- Section 25524.1 - Finding that technology exists for construction and operation of nuclear fuel rod processing plants
- Section 25524.2 - Finding that there exists demonstrated technology or means for disposal of high-level nuclear waste
- Section 25524.5 - Certification of facility adding generating capacity to potential multiple-facility site in excess of maximum allowable capacity
- Section 25525 - Certification of facility not conforming to applicable standards, ordinances or laws
- Section 25526 - Approval of site for facility any location designated by California Coastal Commission
- Section 25527 - Approval of parks, wilderness, scenic or natural reserves, wildlife protection areas, etc. as site for facility
- Section 25528 - Applicant required to acquire right to prohibit development of privately owned lands in area of proposed site
- Section 25529 - Area established for public use required as condition of certification
- Section 25530 - Reconsideration of decision or order
- Section 25531 - Judicial review of commission decision
- Section 25532 - Establishment of monitoring system
- Section 25534 - Amendment of conditions or revocation of certification; civil penalty; start-of-construction deadline
- Section 25534.1 - Complaint issued to person or entity on whom administrative civil penalty imposed
- Section 25534.2 - Petition for writ of mandate filed by aggrieved party
- Section 25535 - Applicant's costs allowed for ratemaking purposes
- Section 25537 - Results of studies forwarded to federal agencies upon approval of application
- Section 25538 - Request for fee to reimburse local agency for costs of review by local agency
- Section 25539 - Rules and regulations for reviewing certification of modifications of facility
- Section 25540 - Proposal to construct geothermal power plant and related facilities
- Section 25540.1 - Determination as to whether notice and application for geothermal powerplant complete
- Section 25540.2 - Site capable of providing geothermal resources in commercial quantities
- Section 25540.3 - Site for geothermal powerplant proposed will accommodate potential maximum electric generating capacity
- Section 25540.4 - Application for additional facility at potential multiple facility site
- Section 25540.5 - Equivalent certification program delegating to county authority for certification of geothermal powerplants in county
- Section 25540.6 - Application for approval of thermal power plants
- Section 25541 - Exemption of thermal powerplants from chapter
- Section 25541.1 - Thermal powerplants using resource recovery (waste-to-energy) technology
- Section 25541.5 - Review of regulatory program
- Section 25542 - Sites and related facilities to which division not applicable
- Section 25543 - Report on improving siting and licensing process for thermal powerplants of 50 megawatts and larger