The contract shall be entered into by the engineer, and the assessment and warrant, when confirmed, shall be recorded in the office of the engineer.
Ca. Pub. Cont. Code § 21022
The contract shall be entered into by the engineer, and the assessment and warrant, when confirmed, shall be recorded in the office of the engineer.
Ca. Pub. Cont. Code § 21022