Cal. Pub. Contract Code § 20119.6

Current through the 2023 Legislative Session.
Section 20119.6 - [Effective until 1/1/2026] Construction with other procedures and requirements

Except as otherwise provided in this article, the best value procurement method is not intended to change any guideline, criterion, procedure, or requirement of the governing board of the school district to let a contract for a project to the lowest responsible bidder or else reject all bids.

Ca. Pub. Cont. Code § 20119.6

Added by Stats 2015 ch 786 (AB 1185),s 1, eff. 1/1/2016.