Current through the 2023 Legislative Session.
Section 6970 - Purpose of chapter(a) This chapter provides for an alternative procurement procedure for certain transportation projects performed by a regional transportation agency.(b) The Construction Manager/General Contractor method allows the regional transportation agency to engage a construction manager during the design process to provide input on the design. During the design phase, the construction manager provides advice including, but not limited to, scheduling, pricing, and phasing to assist the agency to design a more constructible project.(c) The Legislature finds and declares that utilizing a Construction Manager/General Contractor method requires a clear understanding of the roles and responsibilities of each participant in the process. The Legislature also finds and declares that cost-effective benefits are achieved by shifting the liability and risk for cost containment and project schedule to the construction manager and by permitting the coherent phasing of projects into discrete contract increments.Ca. Pub. Cont. Code § 6970
Added by Stats 2015 ch 413 (AB 1171),s 1, eff. 1/1/2016.