Current through the 2024 Legislative Session.
Section 25244.19 - Source reduction evaluation review(a) On or before September 1, 1991, and every four years thereafter, each generator shall conduct a source reduction evaluation review and plan pursuant to subdivision (b).(b) Except as provided in subdivision (c), the source reduction evaluation review and plan required by subdivision (a) shall be conducted and completed for each site pursuant to the format adopted pursuant to subdivision (a) of Section 25244.16 and shall include, at a minimum, all of the following: (1) The name and location of the site.(2) The SIC Code of the site.(3) Identification of all routinely generated hazardous waste streams that annually weigh 600 kilograms or more and that result from ongoing processes or operations and exceed 5 percent of the total yearly weight of hazardous waste generated at the site, or, for extremely hazardous waste, that annually weigh 0.6 kilograms or more and exceed 5 percent of the total yearly weight of extremely hazardous waste generated at the site. For purposes of this paragraph, a hazardous waste stream identified pursuant to this paragraph shall also meet one of the following criteria:(A) It is a hazardous waste stream processed in a wastewater treatment unit that discharges to a publicly owned treatment works or under a national pollutant discharge elimination system (NPDES) permit, as specified in the Federal Water Pollution Control Act, as amended (33 U.S.C. Sec. 1251 and following).(B) It is a hazardous waste stream that is not processed in a wastewater treatment unit and its weight exceeds 5 percent of the weight of the total yearly volume at the site, less the weight of any hazardous waste stream identified in subparagraph (A).(4) For each hazardous waste stream identified in paragraph (3), the review and plan shall include all of the following information:(A) An estimate of the quantity of hazardous waste generated.(B) An evaluation of source reduction approaches available to the generator that are potentially viable. The evaluation shall consider at least all of the following source reduction approaches:(ii) Operational improvement.(iii) Production process change.(iv) Product reformulation.(5) A specification of, and a rationale for, the technically feasible and economically practicable source reduction measures that will be taken by the generator with respect to each hazardous waste stream identified in paragraph (3). The review and plan shall fully document any statement explaining the generator's rationale for rejecting any available source reduction approach identified in paragraph (4).(6) An evaluation, and, to the extent practicable, a quantification, of the effects of the chosen source reduction method on emissions and discharges to air, water, or land.(7) A timetable for making reasonable and measurable progress towards implementation of the selected source reduction measures specified in paragraph (5).(8) Certification pursuant to subdivision (d).(9) A generator subject to this article shall include in its source reduction evaluation review and plan four-year numerical goals for reducing the generation of hazardous waste streams through the approaches provided for in subparagraph (B) of paragraph (4), based upon its best estimate of what is achievable in that four-year period.(10) A summary progress report that briefly summarizes and, to the extent practicable, quantifies, in a manner that is understandable to the general public, the results of implementing the source reduction methods identified in the generator's review and plan for each waste stream addressed by the previous plan over the previous four years. The report shall also include an estimate of the amount of reduction that the generator anticipates will be achieved by the implementation of source reduction methods during the period between the preparation of the review and plan and the preparation of the generator's next review and plan.(c) If a generator owns or operates multiple sites with similar processes, operations, and waste streams, the generator may prepare a single multisite review and plan addressing all of these sites.(d) Every review and plan conducted pursuant to this section shall be submitted by the generator for review and certification by an engineer who is registered as a professional engineer pursuant to Section 6762 of the Business and Professions Code and who has demonstrated expertise in hazardous waste management, by an individual who is responsible for the processes and operations of the site, or by an environmental assessor who has demonstrated expertise in hazardous waste management. The engineer, individual, or environmental assessor shall certify the review and plan only if the review and plan meet all of the following requirements: (1) The review and plan addresses each hazardous waste stream identified pursuant to paragraph (3) of subdivision (b).(2) The review and plan addresses the source reduction approaches specified in subparagraph (B) of paragraph (4) of subdivision (b).(3) The review and plan clearly sets forth the measures to be taken with respect to each hazardous waste stream for which source reduction has been found to be technically feasible and economically practicable, with timetables for making reasonable and measurable progress, and properly documents the rationale for rejecting available source reduction measures.(4) The review and plan does not merely shift hazardous waste from one environmental medium to another environmental medium by increasing emissions or discharges to air, water, or land.(e) At the time a review and plan is submitted to the department or the unified program agency, the generator shall certify that the generator has implemented, is implementing, or will be implementing, the source reduction measures identified in the review and plan in accordance with the implementation schedule contained in the review and plan. A generator may determine not to implement a measure selected in paragraph (5) of subdivision (b) only if the generator determines, upon conducting further analysis or due to unexpected circumstances, that the selected measure is not technically feasible or economically practicable, or if attempts to implement that measure reveal that the measure would result in, or has resulted in, any of the following:(1) An increase in the generation of hazardous waste.(2) An increase in the release of hazardous chemicals to other environmental media.(3) Adverse impacts on product quality.(4) A significant increase in the risk of an adverse impact to human health or the environment.(f) If the generator elects not to implement the review and plan, including, but not limited to, a selected measure pursuant to subdivision (e), the generator shall amend its review and plan to reflect that election and include in the review and plan proper documentation identifying the rationale for that election.Ca. Health and Saf. Code § 25244.19
Amended by Stats 2012 ch 39 (SB 1018),s 53, eff. 6/27/2012.Amended by Stats 2000 ch 343 (SB 2035), s 14, eff. 1/1/2001.