The time limits specified in Article 8 (commencing with Section 1798. 30) may be extended to 60 days by the Franchise Tax Board if the following conditions exist:
Ca. Civ. Code § 1798.66
The time limits specified in Article 8 (commencing with Section 1798. 30) may be extended to 60 days by the Franchise Tax Board if the following conditions exist:
Ca. Civ. Code § 1798.66