Current with legislation from 2024 Fiscal and Special Sessions.
Section 15-58-403 - Costs of projects
The costs for each proposed project under the abandoned mine reclamation program shall include:
(1) Actual construction costs;(2) Actual operation and maintenance costs of permanent facilities;(3) Planning and engineering costs;(4) Construction inspection costs; and(5) Other necessary administrative expenses.