Prior to resuming operation in a temporarily closed quarry, an operator will notify the Division of Environmental Quality by certified mail with a notification of reactivated quarry. This notification will consist of the resubmittal of the notification of intent along with any modifications required, necessary by changed conditions at the quarry site.
Ark. Code § 15-57-406