No extensions or continuances of the 150 day ("standard arbitration") or 90 day ("expedited arbitration") time period within which arbitration must be conducted will be permitted, absent exigent circumstances.
Ill. R. Cir. Ct. Cook Cnty. 25.14
No extensions or continuances of the 150 day ("standard arbitration") or 90 day ("expedited arbitration") time period within which arbitration must be conducted will be permitted, absent exigent circumstances.
Ill. R. Cir. Ct. Cook Cnty. 25.14