Where unexpected conditions necessitate any material change in the plans of proposed work already approved, complete details of the changes must be submitted to and approved by the Supervisor before the work is undertaken. If the change in the nature and scope of well stimulation plans previously disclosed is material, verbal notice to the Supervisor or Authorized Agent is required. Notice of Intent (Form 4) shall be submitted as soon as practical thereafter. Circumstances requiring verbal notice may be limited to those unforeseen material changes in previously approved activities, such as a change in the well stimulation service company, a change in fluid type or chemistry, or a major change in the drilling/completion/recompletion plan.
055-3 Wyo. Code R. § 3-10
Amended, Eff. 6/3/2015.
Amended, Eff. 1/19/2016.
Amended, Eff. 4/1/2016.