Section 77.216-4 - Water, sediment or slurry impoundment and impounding structures; reporting requirements; certification

(a) Except as provided in paragraph (b) of this section, every twelfth month following the date of the initial plan approval, the person owning, operating, or controlling a water, sediment, or slurry impoundment and impounding structure that has not been abandoned in accordance with an approved plan shall submit to the District Manager a report containing the following information:

  • (1) Changes in the geometry of the impounding structure for the reporting period.
  • (2) Location and type of installed instruments and the maximum and minimum recorded readings of each instrument for the reporting period.
  • (3) The minimum, maximum, and present depth and elevation of the impounded water, sediment, or slurry for the reporting period.
  • (4) Storage capacity of the impounding structure.
  • (5) The volume of the impounded water, sediment, or slurry at the end of the reporting period.
  • (6) Any other change which may have affected the stability or operation of the impounding structure that has occurred during the reporting period.
  • (7) A certification by a registered professional engineer that all construction, operation, and maintenance was in accordance with the approved plan.

(b) A report is not required under this section when the operator provides the District Manager with a certification by a registered professional engineer that there have been no changes under paragraphs (a)(1) through (a)(6) of this section to the impoundment or impounding structure. However, a report containing the information set out in paragraph (a) of this section shall be submitted to the District Manager at least every 5 years.

053-5 Wyo. Code R. § 77.216-4