An operator need not comply with paragraph (d) of S 75.500 or with S 75.501 during the period of time specified in a permit issued by the Interim Compliance Panel established by the Act.
053-4 Wyo. Code R. § 75.502
An operator need not comply with paragraph (d) of S 75.500 or with S 75.501 during the period of time specified in a permit issued by the Interim Compliance Panel established by the Act.
053-4 Wyo. Code R. § 75.502