049-8 Wyo. Code R. § 8-3

Current through April 27, 2019
Section 8-3 - Review of Plans and Specifications

(a) Whenever a Child Care Center (CCC) is constructed or remodeled or an existing structure is converted to use as a child-caring facility, a copy of the plans and specifications for such construction, remodeling, or conversion shall be submitted to the authorized health inspector for review and approval at least sixty (60) days prior to the date for bid letting, the date for occupancy or the start of construction. The authorized health inspector shall review the plans and specifications and a letter of approval or disapproval shall be sent within thirty (30) days from the date of receiving the plans. If the plans and specifications are disapproved, each deficiency or item not found on the plans and specifications shall be so indicated on the plan review. The applicant shall then submit a letter to the health inspector indicating that they have changed their plans in accordance with those items listed in the review. Upon receipt of the compliance letter, the authorized health inspector shall issue a letter of approval. This submittal of plans and specifications does not fulfill any requirements of state or local fire officials.

(b) The plans and specifications for a Child Care Center shall include, as required by the regulatory authority based on the type of operation, type of food preparation, and foods prepared, the following information to demonstrate conformance with Rule provisions:

  • (i) Intended menu;
  • (ii) Anticipated volume of food to be stored, prepared, and sold or served;
  • (iii) Proposed layout, mechanical schematics, construction materials, and finish schedules;
  • (iv) Proposed equipment types, manufacturers, model numbers, locations, dimensions, performance capacities, and installation specifications;
  • (v) Evidence that standard procedures that ensure compliance with the requirements of this rule are developed or are being developed; and
  • (vi) Other information that may be required by the regulatory authority for the proper review of the proposed construction, conversion or modification, and procedures for operating an establishment or processing plant.

049-8 Wyo. Code R. § 8-3

Adopted, Eff. 10/7/2016.