Chapter 6 - UTILITY CONSTRUCTION WITHIN HIGHWAY RIGHT-OF-WAY
- Section 6-1 - General
- Section 6-2 - Clear Roadway Recovery Area
- Section 6-3 - Roadway Slopes
- Section 6-4 - Ditches, Culverts, Drainage Pipes, Stockpasses
- Section 6-5 - Attachment to Existing Bridges or Structures
- Section 6-6 - Attachment to Proposed Bridges or Structures
- Section 6-7 - Crossing Underneath Existing Bridges
- Section 6-8 - Appurtenances and Support Facilities
- Section 6-9 - Overhanging Aerial Lines
- Section 6-10 - Buried Facility Crossings
- Section 6-11 - Casing of Utility Lines
- Section 6-12 - Bore and Receiving Pits
- Section 6-13 - Material Storage, Equipment Parking, Access to Work Site
- Section 6-14 - Wetlands
- Section 6-15 - Seismographic Activities
- Section 6-16 - Utility Line Construction by Private Individuals or Developers
- Section 6-17 - Service Connections to Adjacent Developments
- Section 6-18 - Traffic Control and Detours
- Section 6-19 - Restoration of Highway Right-of-Way
- Section 6-20 - Access to Utility Facilities for Construction and Maintenance
- Section 6-21 - Railroad Crossings
- Section 6-22 - Construction Standards
- Section 6-23 - Existing Utility Facilities
- Section 6-24 - Closing of Roads to Traffic
- Section 6-25 - Construction Supervision by Utility
- Section 6-26 - "Call Before You Dig"
- Section 6-27 - Public Telephone Installations
- Section 6-28 - Adherence to Standards, Workmanship
- Section 6-29 - High Voltage Line Safety