(a) Class A, B, C, Prior-operation, and off-load permit fees for oversize loads shall be $25 for any vehicle or load exceeding the statutory limits, plus an additional 3 cents for each foot or fraction thereof exceeding the following dimensions for each mile traveled:
Width: 15 feet
Height: 15 feet
Length (single unit): 75 feet
(b) Class A, B, C, D, Prior-operation, and off-load permit fees for overweight loads shall be 6 cents for each ton or fraction thereof exceeding the statutory limits for each mile traveled, with a minimum fee of $40.
(c) A permit for loads exceeding 125 tons (250,000 pounds) or exceeding allowable weights may require additional analysis to determine routing, structure, and highway capabilities to withstand the load. Permits shall not be issued until the permit holder has paid all costs the Department incurs to process the permit. These costs shall include amounts spent analyzing routes, as well as the cost of sending personnel to accompany load movement.
(d) Class D permit fees are $50 for oversize and a minimum of $40 for overweight. The overweight fee is computed at the rate of 6 cents per ton mile or fraction thereof on weight exceeding the statutory limit. The applicant shall declare the total mileage when applying.
(e) Class E and F permit fees are as follows: a one trip permit may be obtained for a fee of $15 and $50 for an extended period not to exceed 90 days.
(f) The permit fee for commercial moves for oversize recreational vehicles shall be $250.
(g) The custom harvest fee for a 90 day permit is $50 for oversize and a minimum of $40 for overweight. The overweight fee is computed at the rate of 6 cents per ton mile or fraction thereof on weight exceeding the statutory limit.
045-5 Wyo. Code R. § 5-6