(a) All non-reimbursable fees must be paid in advance. All remittances are to be made payable to the "Wyoming State Engineer's Office" except those remittances that are submitted in conjunction with adjudication costs, which are to be made payable to the "Wyoming State Board of Control". Remittances should be transmitted with the application or petition and cover letter.
(b) Fee Schedule. The following fees are required for each instrument filed in the Wyoming State Engineer's Office:
(c) An amount not to exceed fifty ($50.00) of the fees collected for each application for a permit under W.S. 9-1-904(a) (v) (A) and (D) shall be deposited into the account created under W.S. 33-42-116 for wells which require the use of a licensed well driller pursuant to W.S. 33-42-103.
037-1 Wyo. Code R. § 1-4
Amended, Eff. 10/18/2017.