(a) The Commission shall choose from the following list which delivery method shall be used on each individual Commission-funded remedy. - (ii) Construction Manager;
- (iii) Construction Manager At Risk;
(b) The Commission shall consider the following non-exclusive and non-prioritized list of factors to make its decision which delivery method should be used for each Coirimission-funded remedy. A thorough written record shall be created of the basis upon which the Commission makes its decision for each remedy. - (i) Size and complexity of the remedy;
- (ii) Availability of funds;
- (iv) Remoteness of the remedy from needed materials and/or expertise;
- (v) Commission experience with the delivery method in the geographical locale of the remedy;
- (vi) Anticipated cost of the various delivery methods;
- (vii) Available personnel or other professionals to provide supervision and monitoring of design and/or construction;
- (viii) District desires regarding delivery method.
- (ix) A thorough analysis of the requirements of W.S. 21-15-117(b) and (c) that the Commission shall determine the most cost-effective method of remediation of building and facility needs to deliver quality educational services and ensure compliance with the statewide adequacy standards.
027-11 Wyo. Code R. § 11-5