The permittee shall:
(a) Conduct all construction, installation, or modification of any facility permitted consistent with the terms and conditions of the permit. Unauthorized changes, deviations or modifications will be a violation of the permit. A new application or amended application must be filed with the Administrator to obtain modification of a permit. No modification shall be implemented until a new or modified permit has been issued or a waiver given pursuant to subsection b;
(b) Request in writing authorization to utilize materials and/or procedures different from those specified in the terms of the issued permit. Such requests shall be directed to the Administrator. A waiver may be granted if materials and/or procedures specified in the permit cannot be obtained or accomplished and alternative materials and procedures meet minimum standards. In order to prevent undue delay during construction, the Administrator may grant a waiver orally, upon oral request, provided that this request is followed by a written request within five (5) days;
(c) Conduct the operation in accordance with statements, representations, and procedures presented in the complete application and supporting documents, and permit conditions as accepted and authorized by the Administrator;
(d) Conduct all land application or surface disposal operations in accordance with all statements, representations and procedures presented in the complete permit application and supporting documents; and the terms and conditions of the permit; and
(e) Reuse treated wastewater in accordance with all statements, representations and procedures presented in the complete permit application and supporting documents; and the terms and conditions of the permit.
020-3 Wyo. Code R. § 3-11
Amended, Eff. 6/29/2018.