Appendix B - TYPES OF PERMITS REQUIRED TIMING OF COMPLIANCE

Current through April 27, 2019
Appendix B - TYPES OF PERMITS REQUIRED TIMING OF COMPLIANCE

TYPE

DESCRIPTION

TYPE OF PERMIT

WHEN REQUIRED

5A1

Direct Heat Reinjection Facilities

General Permit

2 years after date of general permit

5A2

Heat Pump/Air Conditioner Return Flow Facilities

General Permit

2 years after date of general permit

5A3

Cooling Water Return Flow Facilities

Individual Permit

April 14, 2000

5B1

Mining, Sand or Backfill Facilities

General Permit

2 years after date of general permit

5B2

Aquifer Recharge Facilities

Permit by Rule

register by April 14, 1999

5B3

Saline Water Intrusion Barrier Facilities

Individual Permit

April 14, 2000

5B4

Subsidence Control Facilities

Permit by Rule

register by April 14, 1999

5B5

Facilities used to prevent, control or remediate aquifer pollution, which are not owned or controlled by the Department of Environmental Quality.

General Permit

2 years after the date of the general permit

5B6

Department Controlled Facilities

Permit by Rule

register by April 14, 1999

5B7

Air Sparging Facilities

Permit by Rule

register by April 14, 1999

5C1

Air Scrubber Waste Disposal Facilities

Individual Permit

April 14, 2000

5C2

Water Treatment Brine Disposal Facilities

Individual Permit

April 14, 2000

5C3

Industrial Process Water and Waste Disposal Facilities

Individual Permit

April 14, 2000

5C4

Existing Automotive Waste Disposal Facilities

General Permit

2 years after date of general permit

5C4

New Automotive Waste Disposal Facilities

Ban

April 14, 1998

5C5

Coal Bed Methane Injection Facilities

General Permit

within 6 months of the date of issue for the general permit for existing facilities, and before injection for all new facilities

5C6

Small Commercial Disposal Systems

General Permit

2 years after the date of the general permit

5D1

Agricultural Drainage Facilities

General Permit

2 years after the date of the general permit

5D2

Storm Water Drainage Facilities

General Permit

2 years after date of general permit

5D3

Improved Sinkholes

Individual Permit

April 14, 2000

5D4

Industrial Drainage Facilities

Individual Permit

April 14, 2000

5D5

Special Drainage Facilities

Permit by Rule

register by April 14, 1999

5E1

Aquaculture Return Flow Facilities

General Permit

2 years after date of general permit

5E2

Existing Untreated Domestic sewage Disposal Facilities (Cesspools)

Ban

April 14, 1998

5E3

Existing Domestic Subsurface Fluid Distribution Systems

General Permit

2 years after date of general permit

5E3

Existing Domestic Subsurface Fluid Distribution Systems - Permitted as a small wastewater facility

Permit by Rule

register by April 14, 1999

5E4

New Domestic Wastewater Treatment Plant Disposal Facilities

Individual Permit

April 14, 2000

5E5

Small Domestic Subsurface Fluid Distribution Systems

General Permit

2 years after the date of the general permit

5F1

Cathodic Protection Facilities

Permit by Rule

register by April 14, 1999

5F2

All other facilities that inject fluids into or above an underground source of drinking water which do not fall into Classes I, II, III, or IV injection facilities.

Individual Permit

April 14, 2000

/pjb

11543-doc.wpd

June 22, 2001